Dozens of MetraGators find their way Into Orange County Convention Center

Engineers for the Orange County Convention Center project, Phase V, chose MetraGators over other expansion joints, installing them throughout the engineered piping system.

A facility of this size has extremely long runs of heating and cooling water piping for the building comfort systems. MetraGators are the perfect joints for these large commercial systems.

Compact and maintenance-free, these joints cost significantly less to install, and easily meet the needs specified by the project engineers.

gator2

The Orlando Convention Center is during its expansion.

gator5

MetraGators were found to be the perfect joints for these large commercial systems.

gator4

Although usually not necessary, a drain valve can be installed on the gator’s “belly”.

gator1

This 24″ Gator installed prior to completion of the buildings structural steel. These temporary restraints will allow the pressure testing of this section to keep piping on schedule.